COFOT (Crude Oil and Fuel Oil Tanks) Construction and Mechanical Works Project

COFOT (Crude Oil and Fuel Oil Tanks) Construction and Mechanical Works Project

2019-2022

Project Details

Scope of Deep Excavation Support, Slope Stabilization Manufacturing Works:

16,905 m of Bored Pile Installation
16,100 m of Ground Anchoring Installation
15,100 m2 of Shotcrete Works

Scope of Instrumental Field Measurement Works for Deep Excavation Support, Slope Stabilization;

506 m of Inclinometer Installation and Measurements
366 m of Extensometer Installation and Measurements
283 m of Piezometer Installation and Measurements
8 Load Cell Installations and Measurements

Scope of Sub-Foundation Bored Pile Works

18,000 m of Reinforced Bored Pile Installation